This training is an introduction to continuous modeling with FLAC2D and FLAC3D. At the end of the course, participants will master the graphical interface, documentation and the main modeling steps. Concepts are illustrated using a tunnel excavation example, from building the model geometry to results analysis. This introductory course provides the foundation for more advanced use of the software, which can be covered in more specific training modules.
A three-dimensional groundwater flow model was constructed for Sishen Mine. The purpose of the model is to predict the required dewatering rate and boreholes to maintain dry working conditions in the mine.
Sishen Mine in South Africa, one of the largest open pit iron mines in the world, is characterized by a complex, compartmentalized hydrogeologic setting that comprises numerous dykes, regional water‐bearing faults and inter‐bedded localized geologic units. The objective was to simulate the unique geologic setting for effective mine water management and dewatering planning at the mine.
A conceptual model was developed to assess the regional hydrogeologic setting before and during the course of mining. A three‐dimensional (3D) finite‐element groundwater flow model was constructed using MINEDW to accurately predict mine dewatering rates by integrating the conceptual model with site characterization data, the mining development plan, and the mine closure plan. The model was calibrated to both pre‐mining (steady‐state) and transient conditions. In addition to water levels, residual passive inflow (RPI), which refers to the seepage rate into the pit under active dewatering conditions, was also used in the model calibration.
Itasca used the calibrated model to predict different dewatering options for various mining scenarios. Based on the model predictions, Itasca also made recommendations of monitoring borehole locations and additional dewatering boreholes for effective mine water management.
Liu, H., E. Nel, J. Kotze and D. Ding. (2013) “Mine Dewatering in a Compartmentalized Hydrogeological Setting at Sishen Mine in South Africa,” in Reliable Mine Water Technology (Proceedings, International Mine Water Association 2013 Annual Conference, Golden, Colorado, August 2013), Vol. 1, 157–162, Sydney, Canada: IMWA.